pi-dgoal
Pi extension with one Work List and independently selectable execution, goal-check, and staged-check assurance.
Package details
Install pi-dgoal from npm and Pi will load the resources declared by the package manifest.
$ pi install npm:pi-dgoal- Package
pi-dgoal- Version
0.8.1- Published
- Aug 8, 2026
- Downloads
- 881/mo · 46/wk
- Author
- diwu507
- License
- MIT
- Types
- extension
- Size
- 909.6 KB
- Dependencies
- 0 dependencies · 4 peers
Pi manifest JSON
{
"extensions": [
"./index.ts"
]
}Security note
Pi packages can execute code and influence agent behavior. Review the source before installing third-party packages.
README
pi-dgoal
English | 中文
A Pi extension that keeps one Work List per session goal and adds only the assurance the work needs. Ordinary work can remain a soft list; sustained execution and independent checks are separate, one-way upgrades on that same list.
v0.8.1 is a breaking release (ADR 0051). The public surface is nine new tools, persistence moves to
dgoal-work-v1plusdgoal-plan-history-v1, and active state from pre-v0.8.1 releases is intentionally not migrated.
Choose the Right Assurance
| Mode | Choose it when | Continuation | Independent checks |
|---|---|---|---|
| Soft Work List | Ordinary multi-step work benefits from visible cross-turn tracking | No | None |
| Execution Plan | The agent must keep working Until Done | Yes | None |
| Goal Check Plan | The final outcome needs an independent acceptance check | Yes | goal_check |
| Staged Check Plan | Real serial Phases and the final outcome each need independent checks | Yes | phase_check + goal_check |
The structure and assurance are orthogonal: a Work List may be flat or contain optional real Phases. A Phase exists only for a genuine serial boundary; there is no hidden Phase. A Plan Contract can only upgrade execution → goal_check → staged_check and keeps existing IDs, terminal states, and evidence.
Discussions, explanations, capability questions, and one-step answers should not create a list. Independent-check Profiles require explicit user authorization through /dgoal or an equally clear request; the agent must not silently add that assurance.
Compose with dteam
dteam remains an optional model-tier routing and fresh-context execution layer. It can operate inside any Work List or Plan Contract. The main agent still owns scope, evidence synthesis, conflicts, and final state updates.
Install
pi install npm:pi-dgoal
Load a development checkout directly:
pi -e ./index.ts
Usage
Ordinary work: Soft Work List
When tracking adds value, the agent calls work_list and advances Work Items with work_create / work_update.
work_list
→ work_create / work_update(item)
→ every Work Item terminal and every real Phase explicitly done
→ automatic close + visible completion summary
A soft list persists across turns but starts no continuation, no no-progress counters, and no auditor. Description and evidence are optional while it remains soft. Once all Work Items are terminal (done or abandoned) and every real Phase is explicitly done, the current Goal is cleared atomically and the tool returns a structured completion signal.
Sustained work: Execution Plan
execution_plan establishes or upgrades the same Work List to Until Done execution. Planned Work Items require Description; done requires reproducible evidence, and declared deliverables require one-to-one deliverableEvidence.
execution_plan
→ work_create / work_update(item)
→ explicitly close each real Phase with work_update(phase, done)
→ work_update(goal, done): summary + verification
Execution Plan has fixed model-error and structured no-progress circuit breakers but no independent audit.
Explicit dgoal: Goal Check / Staged Check
/dgoal <clear objective>
An imperative such as “use dgoal to complete this objective” enters the same startup gate. The agent reads the relevant code and documentation, chooses Goal Check or Staged Check, submits independently verifiable acceptance criteria, passes semantic preflight, and waits for user confirmation. A rejected proposal or failed confirmation does not mutate the current Work List.
Goal Check Plan
goal_plan → work_update(item/phase) → goal_check → work_update(goal, done)
Staged Check Plan
staged_plan
→ [work_update(item) → phase_check → work_update(phase, done)] × N
→ goal_check → work_update(goal, done)
A check records a CheckRecord only. It never marks a Phase or Goal done. Only work_update writes completion state; a stale or late result is discarded when the relevant revision, Goal, or session branch changes.
In Staged Check, non-terminal work must enter the confirmed Phase backbone while any Phase remains open. Once every Phase is explicitly done, work_create may add goal-level root follow-up without reopening or mutating a done Phase; that work must finish before the next goal_check and survives session reload.
Nine Tools
| Tool | Responsibility |
|---|---|
work_list |
Create or atomically rewrite the current soft Work List |
execution_plan |
Create or upgrade to an Until Done Execution Plan |
goal_plan |
Submit a Goal Check Plan proposal with goal-level independent acceptance |
staged_plan |
Submit a Staged Check Plan proposal with Phase- and goal-level acceptance |
work_create |
Add a Work Item, or a real Phase when the active Profile permits it |
work_read |
Read full Goal, Work List, Phase, Work Item, deliverable/evidence detail, or session Plan Run History |
work_update |
Sole agent-facing writer for Work Item / Phase / Goal state and completion |
phase_check |
Independently check the current Staged Check Phase; record only |
goal_check |
Independently check the complete Goal; record only |
Tool names follow a two-word rule and do not use a dgoal_ prefix. dgoal remains the product and user-command name.
Work Item IDs are unique across the whole Work List; Phase IDs use a separate namespace. Both start at 1. blockedBy always references Work Item IDs, cannot form a cycle, and cannot point from an earlier Phase into a future Phase.
Goal and real Phase Descriptions are required. Work Item Description becomes required under every Plan Contract. Description explains purpose and method; it is execution guidance, not an extra acceptance gate. Hard completion conditions belong in acceptanceCriteria; subjective review belongs in userReviewItems.
Completion and State Guards
donenever regresses.abandoned,blocked, and agent-initiatedpausedrequire reasons.- A real Phase never auto-completes when its members are exhausted;
work_update(target=phase,status=done)is always explicit. - Goal Check and Staged Check completion require an approved
goal_checkfor the current Work List revision. - A Staged Check Phase requires an approved
phase_checkfor its current local revision beforework_updatecan mark it done. - Business rejection keeps the Plan active for repair.
audit_errorpauses safely. - Every close writes
done, then a null tombstone, then clears continuation, proposal, liveness counters, check snapshots, and authorizations before UI after-effects. The returneddgoal completion signalcontains summary and verification so closure is never silent.
Commands
/dgoal <objective> Start Goal Check / Staged Check selection and confirmation
/dgoal Continue the preceding context into the startup gate
/dgoal status | s Open current Work List and session History
/dgoal pause | p Pause an active Plan Contract
/dgoal resume | r Resume a paused Plan Contract
/dgoal clear | c Clear the current Goal / Work List
/dgoal history clear Confirm and clear this session's Plan Run History
/dgoal help | h Explain current behavior
Soft Work Lists cannot enter Plan pause state. Fixed continuation circuit breakers apply only while a Plan Contract is active. No-progress detection observes structured tool activity and durable state changes; it never parses assistant prose or shell command strings.
TUI
- Persistent widget: shows the active Profile, aggregate progress, real Phases, and current Work Items.
Ctrl+O: expands Work Items and current audit activity./dgoal smodal: lists the current Work List and Plan Run History; details show Description, status, dependencies, evidence, reasons, deliverables, and applicable check records.- Fail-soft: widget, modal, status, or notification errors may degrade presentation but cannot block persistence, completion, or recovery.
Completed Phases remain visible in the TUI and History. In the execution prompt they are soft-forgotten to a title-only line so old details do not keep expanding model context.
Independent Auditing
phase_check and goal_check run isolated Pi subprocesses with fresh context and limited read/verification tools. They inherit the current session model by default, or use up to three ordered candidates:
{
"phaseAuditorModels": null,
"goalAuditorModels": null,
"proposalSemanticReviewIdleTimeoutSeconds": 60
}
Configure globally at ~/.pi/agent/pi-dgoal.json or in trusted projects at .pi/pi-dgoal.json. Candidate syntax is provider/model[:thinking]. Business rejection never changes candidates; only technical failures do. Exhaustion pauses safely. Legacy single-candidate model config keys remain accepted.
Persistence and History
dgoal-work-v1stores the one current Goal, Work List, optional Plan Contract, and pending proposal.dgoal-plan-history-v1stores append-only Plan Run History for the current session branch.- History preserves structural completion evidence and check outcomes, but strips auditor reports, feedback, thinking, transcript, and mutation logs. History is read-only and cannot be resumed.
- Pre-v0.8.1 activity is intentionally ignored and not migrated. After upgrading, recreate the active Work List.
session_treeandsession_compactrestore only validated structured state. Active Plan Contracts resume continuation after compaction when Pi is not already retrying the turn; soft Work Lists do not.
Design Boundaries
- One current Goal / Work List per session; no multi-goal pool, daemon, scheduler, or cross-session background execution.
- No automatic Git commit, rollback, push, publish, or deployment.
- Project tests remain authoritative; dgoal does not replace them.
- Visual and experiential checks belong in
userReviewItems, not machine completion gates. - Staged Check Phase backbone is frozen after confirmation. Other Profiles may add real Phases only when they remain valid serial boundaries.
Tests
npm test # Bun unit/integration suite
npm run test:rpc # RPC loading and nine-tool registration
npm run test:context # Context and acceptance-prompt tests
npm run test:smoke:runtime # Deterministic smoke runtime logic
npm run test:smoke:cleanup # Auditor subprocess cleanup smoke
npm run test:smoke # Real-model isolated smoke (uses tokens)
Real TUI confirmation, modal, widget, and interaction behavior still needs manual review; automated tests do not claim human TUI acceptance.
Project Layout
pi-dgoal/
├── index.ts
├── src/
│ ├── work-list/ # Work List data model, validation, and reducer
│ ├── runtime/ # Nine tools, lifecycle, startup gate, persistence, prompts, TUI composition
│ ├── startup/ # Extension event wiring and default guidance
│ ├── goal-runtime/ # Session Goal, Plan Contract, continuation, history, and audit liveness state
│ ├── audit/ # Independent audit protocol and checkpoints
│ ├── isolated-pi/ # Isolated Pi subprocess
│ └── tui/ # Stateless scrolling, width, elapsed-time, and text-style helpers
├── test/
└── doc/
See doc/README.md, doc/术语表.md, ADR 0051, and the v0.8.1 implementation plan.